時(shí)間:2023-08-28 09:22:22
緒論:在尋找寫(xiě)作靈感嗎?愛(ài)發(fā)表網(wǎng)為您精選了8篇通信工程的定義,愿這些內(nèi)容能夠啟迪您的思維,激發(fā)您的創(chuàng)作熱情,歡迎您的閱讀與分享!
[關(guān)鍵詞] 穩(wěn)定型心絞痛;伊伐布雷定;血管內(nèi)皮功能;動(dòng)脈粥樣硬化
[中圖分類(lèi)號(hào)] R541.4 [文獻(xiàn)標(biāo)識(shí)碼] A [文章編號(hào)] 1673-7210(2017)01(c)-0160-04
[Abstract] Objective To investigate the effect of Ivabradine on stable angina pectoris and its influence on vascular endothelial function and atherosclerosis. Methods One hundred and seventy patients with stable angina pectoris admitted to Department of Cardiology, General Hospital of Benxi Iron and Steel Co.,Ltd. from January 2012 to January 2015 were selected and randomly divided into two groups by random number table. 85 cases of control group were treated with Atenolol, 85 cases of observation group were treated with Ivabradine. The clinical curative effect and the changes of vascular endothelial function and arteriosclerosis status before treatment and after treatment for 4 weeks were compared. Results The difference of the clinical curative effect between the two groups was statistically significant (u = 2.814, P < 0.05). After treatment, the resting heart rate (RHR), exercise heart rate (EHR), angina attacks times and duration of the observation group were much lower or shorter than those of control group (P < 0.05). After treatment, the levels of nitric oxide (NO) and superoxide dismutase (SOD) in the observation group were much higher than those in control group, the levels of endothelin-I (ET-1), malondialdehyde (MDA) and the value of brachial-ankle pulse wave velocity (baPWV) in the observation group were much lower than those in control group (P < 0.05). Conclusion Ivabradine in the treatment of stable angina pectoris can decrease the RHR and EHR effectively, and also can improve the vascular endothelial function and arteriosclerosis status, which has definite therapeutic effect.
[Key words] Stable angina pectoris; Ivabradine; Vascular endothelial function; Arteriosclerosis
定型心絞痛(stable angina pectoris,SAP)是一種病理基礎(chǔ)簡(jiǎn)單的冠狀動(dòng)脈疾病,臨床表現(xiàn)為下頜、上臂、胸或肩背憋悶疼痛[1-2]。不少研究顯示[3-4],血管內(nèi)皮功能的損傷、冠狀動(dòng)脈的狹窄及硬化易誘發(fā)冠脈不良事件的發(fā)生。故臨床治療中,緩解SAP臨床癥狀的同時(shí),更應(yīng)關(guān)注患者血管內(nèi)皮功能及動(dòng)脈硬化程度。伊伐布雷定[5-6]是一種特異性、選擇性If電流抑制劑,通過(guò)減慢患者心率,降低心肌耗氧量,有效緩解心絞痛。目前,有關(guān)伊伐布雷定對(duì)患者血管內(nèi)皮功能及動(dòng)脈硬化情況的影響鮮有報(bào)道。本文旨在研究該藥對(duì)SAP患者血管內(nèi)皮功能及動(dòng)脈硬化情況的影響,以期探討其臨床療效及預(yù)后效果。
1 資料與方法
1.1 一般資料
本研究對(duì)象為遼寧省本溪市本鋼總醫(yī)院心內(nèi)科2012年1月~2015年1月收治的170例SAP患者,其中,男65例,女105例,年齡40~67歲,平均(50.1±4.5)歲。納入標(biāo)準(zhǔn):①符合《慢性穩(wěn)定型心絞痛診斷與治療指南》[7]的診斷標(biāo)準(zhǔn),且心絞痛CCS分級(jí)Ⅰ~Ⅲ級(jí)。②具有心絞痛癥狀,且符合下列條件之一或多項(xiàng):冠脈介入或冠脈搭橋術(shù)超過(guò)6個(gè)月;心肌梗死超過(guò)3個(gè)月;缺血型心電圖改變;冠脈造影顯示一條或多條冠狀動(dòng)脈口徑狹窄超過(guò)50%;心絞痛發(fā)作時(shí),心電圖結(jié)果出現(xiàn)ST段抬高超過(guò)1.0 mm或P-R段相比旱統(tǒng)過(guò)1.0 mm。③運(yùn)動(dòng)平板試驗(yàn)結(jié)果陽(yáng)性。④左心室射血分?jǐn)?shù)超過(guò)50%。⑤病史超過(guò)3個(gè)月。⑥對(duì)本研究知情,且自愿簽署知情同意書(shū)。排除標(biāo)準(zhǔn):①急性心力衰竭或急性冠脈綜合征者。②先天性心臟疾病或心臟瓣膜疾病者。③慢性肺部疾病或脊柱畸形者。④合并內(nèi)分泌疾病者。⑤神經(jīng)肌肉疾病者。⑥3個(gè)月內(nèi)服過(guò)胺碘酮或7 d內(nèi)服過(guò)非二氫吡啶類(lèi)、β受體阻斷劑等抗心律失常藥者。⑦長(zhǎng)期酗酒者。⑧合并心律失?;蜢o息狀態(tài)下心率低于60次/min者。
按照隨機(jī)數(shù)字法將入選者分為兩組。對(duì)照組85例,其中男30例,女55例;平均年齡(49.8±5.1)歲;平均病程(5.1±0.4)個(gè)月;心絞痛CCS分級(jí)Ⅰ級(jí)32例,Ⅱ級(jí)38例,Ⅲ級(jí)15例。觀察組85例,其中男35例,女50例;平均年齡(51.0±4.7)歲;平均病程(5.8±0.7)個(gè)月;心絞痛CCS分級(jí)Ⅰ級(jí)30例,Ⅱ級(jí)41例,Ⅲ級(jí)14例。兩組患者性別、年齡、病程、心絞痛CCS分級(jí)方面差異無(wú)統(tǒng)計(jì)學(xué)意義(P > 0.05),具有可比性。此外,本研究獲得醫(yī)院倫理委員會(huì)批準(zhǔn)。
1.2 方法
所有患者均給予基礎(chǔ)藥物治療,主要包括他汀類(lèi)降脂藥、血管緊張素Ⅱ受體拮抗劑、血管緊張素轉(zhuǎn)換酶抑制劑、阿司匹林等藥物治療,劑量按說(shuō)明書(shū)服用。觀察組給予伊伐布雷定(辰新藥業(yè)股份有限公司,批號(hào):201325),5.0 mg/次,每天2次。對(duì)照組給予阿替洛爾(辰新藥業(yè)股份有限公司,批號(hào):201134),15.5 mg/次,每天2次。持續(xù)治療4周。
1.3 觀察指標(biāo)
所有患者于治療前和治療4周后進(jìn)行檢查。①療效評(píng)價(jià)[8]:癥狀顯著減輕,且同程度運(yùn)動(dòng)量患者心絞痛發(fā)作頻率減少≥80%,或未出現(xiàn)過(guò)心絞痛視為顯效;癥狀相對(duì)減輕,同程度運(yùn)動(dòng)量患者心絞痛發(fā)作頻率減少50%~
1.4 統(tǒng)計(jì)學(xué)方法
采用SPSS 19.0軟件包進(jìn)行統(tǒng)計(jì)學(xué)分析,計(jì)量資料以均數(shù)±標(biāo)準(zhǔn)差(x±s)表示,采用t檢驗(yàn);計(jì)數(shù)資料以例數(shù)或百分比表示,采用χ2檢驗(yàn);等級(jí)資料比較采用秩和檢驗(yàn)。以P < 0.05為差異有統(tǒng)計(jì)學(xué)意義。
2 結(jié)果
2.1 兩組臨床療效比較
秩和檢驗(yàn)分析發(fā)現(xiàn),兩組臨床療效比較,差異有統(tǒng)計(jì)學(xué)意義(u = 2.814,P = 0.005)。見(jiàn)表1。
2.2 兩組治療前后心率變化情況比較
治療前,兩組患者RHR及EHR比較,差異無(wú)統(tǒng)計(jì)學(xué)意義(P > 0.05)。經(jīng)不同方法治療后,觀察組RHR及EHR較治療前顯著降低,且均明顯低于對(duì)照組,差異有統(tǒng)計(jì)學(xué)意義(P < 0.05)。見(jiàn)表2。
2.3 兩組治療前后心絞痛發(fā)作頻率、持續(xù)時(shí)間比較
治療前,兩組患者心絞痛發(fā)作頻率、持續(xù)時(shí)間比較,差異無(wú)統(tǒng)計(jì)學(xué)意義(P > 0.05)。經(jīng)不同方法治療后,觀察組心絞痛發(fā)作頻率較治療前顯著減少,心絞痛發(fā)作持續(xù)時(shí)間較治療前顯著縮短,且均明顯低于對(duì)照組,差異有統(tǒng)計(jì)學(xué)意義(P < 0.05)。見(jiàn)表3。
2.4 兩組血管內(nèi)皮功能標(biāo)志物水平變化比較
治療前,兩組患者血清中NO、ET-1、SOD和MDA水平比較,差異無(wú)統(tǒng)計(jì)學(xué)意義(P > 0.05)。經(jīng)不同方法治療后,觀察組NO和SOD水平較治療前顯著升高,且明顯高于對(duì)照組,差異有統(tǒng)計(jì)學(xué)意義(P < 0.05),ET-1和MDA水平較治療前顯著下降,且明顯低于對(duì)照組,差異有統(tǒng)計(jì)學(xué)意義(P < 0.05)。見(jiàn)表4。
2.5 兩組治療前后肱-踝脈搏波傳導(dǎo)速度變化比較
治療后,兩組患者baPWV均顯著低于治療前(P < 0.05),且觀察組治療后baPWV明顯低于對(duì)照組,差異有統(tǒng)計(jì)學(xué)意義(P < 0.05)。見(jiàn)表5。
3 討論
研究發(fā)現(xiàn)[9],心絞痛發(fā)病多因心肌供需氧不平衡所致,故臨床上常用減少心肌耗氧或增加冠脈流量的方法緩解心絞痛癥狀。擴(kuò)血管藥物在增加冠脈流量方面雖效果明顯,但當(dāng)患者冠脈鈣化時(shí),擴(kuò)管效果則較難實(shí)現(xiàn)[10]。減慢心率、降低心肌耗氧量的抗心絞痛藥物逐漸成為治療心絞痛重要的途徑[11-13]。伊伐布雷定通過(guò)抑制心臟竇房結(jié)內(nèi)If電流,延長(zhǎng)心臟動(dòng)作電位時(shí)間間隔,降低竇房結(jié)節(jié)律,降低患者心率,降低心肌耗氧量,達(dá)到控制心絞痛的效果[14-17]。本研究結(jié)果也發(fā)現(xiàn),觀察組治療后RHR及EHR明顯降低,心絞痛發(fā)作頻率及持續(xù)時(shí)間也明顯低于或短于對(duì)照組,說(shuō)明伊伐布雷定對(duì)SAP的治療效果明確。
據(jù)報(bào)道,NO、ET-1、SOD和MDA水平與血管內(nèi)皮功能損傷具有密切關(guān)聯(lián)[18]。其中NO是一種重要的舒血管物質(zhì),它與ET-1相互保持平衡,維持血管正常收縮及舒張?zhí)匦裕籈T-1具有強(qiáng)烈的縮血管功能,參與缺血性腦血管疾病的病理過(guò)程,且該指標(biāo)的升高與梗死面積大小相關(guān)[19-20];SOD能對(duì)抗氧自由基對(duì)細(xì)胞的損害,同時(shí)修復(fù)受損細(xì)胞[17]。MDA則在血管內(nèi)皮細(xì)胞受損時(shí)會(huì)明顯升高,反映血管內(nèi)皮特性[21]。研究發(fā)現(xiàn),兩組患者血漿中ET-1和MDA水平在治療后均明顯下降,與治療前相比差異有統(tǒng)計(jì)學(xué)意義(P < 0.05),但觀察組治療后ET-1和MDA水平^對(duì)照組明顯偏低;兩組患者血漿中NO和SOD水平在治療后均明顯升高,與治療前相比差異有統(tǒng)計(jì)學(xué)意義(P < 0.05),但觀察組治療后NO和SOD水平較對(duì)照組明顯偏高;說(shuō)明兩種治療方法對(duì)患者內(nèi)皮均具有保護(hù)作用,其中伊伐布雷定對(duì)患者內(nèi)皮的保護(hù)作用更為顯著。這可能與以下幾點(diǎn)內(nèi)皮保護(hù)機(jī)制有關(guān):①下調(diào)血清中低氧誘導(dǎo)因子-1α表達(dá),拮抗內(nèi)皮細(xì)胞凋亡[22];②降低血清中血管內(nèi)皮生長(zhǎng)因子濃度,修復(fù)受損內(nèi)皮細(xì)胞[23-24];③平衡體內(nèi)NO與ET-1水平,維持血管正常收縮及舒張?zhí)匦裕瑴p少梗死面積[25];④平衡體內(nèi)SOD與MDA水平,修復(fù)受損細(xì)胞。
baPWV主要反映動(dòng)脈搏動(dòng)由近心端向遠(yuǎn)心端的傳導(dǎo)速度,是反映動(dòng)脈硬化程度的黃金指標(biāo)。研究表明,當(dāng)baPWV值增加時(shí),患者的冠心病進(jìn)展程度會(huì)隨之加快,且相關(guān)不良危險(xiǎn)因素會(huì)隨之產(chǎn)生[26]。本研究發(fā)現(xiàn)伊伐布雷定能有效減低baPWV值,這可能由于其能夠增加血漿中去甲腎上腺素濃度,改善冠脈血流。
總之,伊伐布雷定治療SAP患者,能夠有效降低患者靜息狀態(tài)及運(yùn)動(dòng)量心率,減少心絞痛發(fā)病次數(shù)及病發(fā)持續(xù)時(shí)間,能夠有效改善患者血管內(nèi)皮功能和動(dòng)脈硬化情況,療效確切。
[參考文獻(xiàn)]
[1] Füeβl HS. Stable angina pectoris:assessment [J]. MMW Fortschr Med,2016,158(10):10-14.
[2] Valgimigli M,Biscaglia S. Stable angina pectoris [J]. Curr Atheroscler Rep,2014,16(7):422-423.
[3] Fishbein MC,F(xiàn)ishbein GA. Arteriosclerosis:facts and fancy [J]. Cardiovasc Pathol,2015,24(6):335-342.
[4] T?ille M,Reshetnik A,Schuchardt M,et al. Arteriosclerosis and vascular calcification:causes,clinical assessment and therapy [J]. Eur J Clin Invest,2015,45(9):976-985.
[5] Ye L,Ke D,Chen Q,et al. Effectiveness of ivabradine in treating stable angina pectoris [J]. Medicine(Baltimore),2016,95(14):e3245-3247.
[6] Tendera M,Borer JS,Tardif JC. Efficacy of I(f)inhibition with ivabradine in different subpopulations with stable angina pectoris [J]. Cardiology,2009,114(2):116-125.
[7] 中華醫(yī)學(xué)會(huì)心血管病學(xué)分會(huì).中華心血管病雜志編輯委員會(huì).慢性穩(wěn)定型心絞痛診斷與治療指南[J].中華心血管病雜志,2007,35(3):195-206.
[8] 中華人民共和國(guó)衛(wèi)生部醫(yī)政司.中國(guó)常見(jiàn)心腦血管疾病診治指南[M].北京:科學(xué)出版社,2000:59-60.
[9] Parker JD,Parker JO. Stable angina pectoris:the medical management of symptomatic myocardial ischemia [J]. Can J Cardiol,2012,28(2 Suppl):S70-S80.
[10] Wang FF,Han JL,He R,et al. Prognostic value of coronary artery calcium score in patients with stable angina pectoris after percutaneous coronary intervention [J]. J Geriatr Cardiol,2014,11(2):113-119.
[11] Feng J,Wang A,Gao C,et al. Altered heart rate variability depend on the characteristics of coronary lesions in stable angina pectoris [J]. Anatol J Cardiol,2015,15(6):496-501.
[12] Zagidullin N,Scherbakova E,Safina Y,et al. The impact of remote ischemic preconditioning on arterial stiffness and heart rate variability in patients with angina pectoris [J]. J Clin Med,2016,5(7):E60-E63.
[13] Tendera M,F(xiàn)ox K,F(xiàn)errari R,et al. Inadequate heart rate control despite widespread use of beta-blockers in outpatients with stable CAD:findings from the international prospective CLARIFY registry [J]. Int J Cardiol,2014, 176(1):119-124.
[14] Giavarini A,de Silva R. The role of ivabradine in the management of angina pectoris [J]. Cardiovasc Drugs Ther,2016,30(4):407-417.
[15] ,鐘偉州.鹽酸曲美他嗪治療冠心病穩(wěn)定型心絞痛的效果觀察[J].中國(guó)醫(yī)學(xué)創(chuàng)新,2015,12(14):52-54.
[16] 尚士國(guó),郭琴.冠心病與血清同型半胱氨酸相關(guān)性的臨床研究[J].中國(guó)現(xiàn)代醫(yī)生,2015,53(17):20-21,24.
[17] 何衛(wèi)斌,楊桂.冠心病患者血漿同型半胱氨酸、白細(xì)胞介素-6、B型利鈉肽的表達(dá)及臨床意義[J].中國(guó)醫(yī)藥導(dǎo)報(bào),2015,12(14):50-52,70.
[18] 張騰,李岳春,革麗莎,等.伊伐布雷定對(duì)病毒性心肌炎小鼠的心功能和兒茶酚胺作用[J].中國(guó)臨床藥理學(xué)與治療學(xué),2015,20(8):859-864.
[19] 李建蘭.老年冠心病患者超敏C反應(yīng)蛋白、D-二聚體的相關(guān)性研究[J].中國(guó)現(xiàn)代醫(yī)生,2015,53(13):114-117.
[20] Lee JY,Ryu S,Lee SH,et al. Association between brachial-ankle pulse wave velocity and progression of coronary artery calcium:a prospective cohort study [J]. Cardiovasc Diabetol,2015,4(14):147-149.
[21] Zhang F,Wu SZ,Zhang L,et al. Effects of simvastatin on plasma SOD,MDA and 8-iso-PGF2α in patients with stable angina [J]. Nan Fang Yi Ke Da Xue Xue Bao,2010, 30(12):2646-2648.
[22] Ates O,Azizi S,Alp HH,et al. Decreased serum paraoxonase 1 activity and increased serum homocysteine and malondialdehyde levels in age-related macular degeneration [J]. Tohoku J Exp Med,2009,217(1):17-22.
[23] S通,駱眾星,周華,等.N末端腦鈉素原水平與冠心病患者 危險(xiǎn)分層及全球急性冠狀動(dòng)脈事件注冊(cè)評(píng)分的相關(guān)性[J].中國(guó)醫(yī)藥導(dǎo)報(bào),2015,12(17):68-71.
[24] 王寶魁,劉松,徐少杰,等.伊伐布雷定對(duì)急性心肌梗死兔血清中HIF-1α和VEGF表達(dá)影響[J].青島大學(xué)醫(yī)學(xué)院學(xué)報(bào),2013,49(1):56-58.
[25] 張瑾,徐慧.穩(wěn)定型心絞痛采用曲美他嗪治療的效果及安全性評(píng)價(jià)[J].中外醫(yī)學(xué)研究,2016,14(18):23-24.
關(guān)鍵詞: 爐頂、裝料、布料
Abstract: new steel group company top system is 11 blast furnace in one of the engineering construction projects, mainly through the PLC control device for the entire top system realization of main equipment of monitoring, complete in accordance with the production needs to control equipment will burden in material roof tank and the right control top equipment in furnace burden realize accurate distribution, meet the blast furnace production
Keywords: top, with makings, cloth
中圖分類(lèi)號(hào): F416.31 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):
一. 項(xiàng)目概況
爐頂項(xiàng)目是公司11#高爐工程建設(shè)項(xiàng)目之一,根據(jù)項(xiàng)目設(shè)計(jì),本高爐爐頂采用串罐式無(wú)料鐘爐頂裝料設(shè)備。它由一個(gè)受料罐和一個(gè)稱(chēng)量料罐以及傳動(dòng)箱,布料溜槽和相應(yīng)的閥門(mén)以及均壓、排壓,探尺等系統(tǒng)組成.
二、設(shè)計(jì)范圍及主要內(nèi)容
爐頂設(shè)有獨(dú)立的PLC控制系統(tǒng)。主要通過(guò)PLC控制裝置實(shí)現(xiàn)對(duì)整個(gè)爐頂系統(tǒng)主要設(shè)備的監(jiān)控,完成按照生產(chǎn)需要控制爐頂設(shè)備將爐料裝入料罐,同時(shí)正確控制爐頂設(shè)備實(shí)現(xiàn)爐料在爐內(nèi)的準(zhǔn)確分布
三、工藝流程簡(jiǎn)介
首先,來(lái)自槽下已配好的料通過(guò)上料主皮帶送入爐頂受料罐備用,當(dāng)下料罐料空,各相應(yīng)閥門(mén)已開(kāi)關(guān)到位,則受料罐向稱(chēng)量下料罐放料。料罐裝料OK,等待布料。
如果高爐未禁止布料,則對(duì)下料罐進(jìn)行均壓,然后開(kāi)下密封閥,同時(shí)根據(jù)程序設(shè)定,傾動(dòng)角α、旋轉(zhuǎn)β角已按控制要求動(dòng)作,當(dāng)旋轉(zhuǎn)角已到步進(jìn)角范圍時(shí),開(kāi)料流調(diào)節(jié)閥,向高爐布料。
布料完畢,開(kāi)關(guān)相應(yīng)閥門(mén),等待裝料
四、控制系統(tǒng)配置介紹和設(shè)計(jì)原則
爐頂控制系統(tǒng)選用的是西門(mén)子公司的PLC系統(tǒng),本系統(tǒng)設(shè)計(jì)一個(gè)S7-400 PLC主站,通過(guò)profibus-DP下掛三個(gè)ET200M子站,同時(shí)各編碼器、變頻器也通過(guò)profibus-DP網(wǎng)與PLC連接。 PLC和上位機(jī)畫(huà)面的通訊采用TCP/IP協(xié)議。
五、控制方案介紹
閥門(mén)控制
爐頂閥門(mén)控制方式包括:操作箱就地控制、 PLC自動(dòng)控制、 PLC帶連鎖的手動(dòng)控制、 PLC解鎖單動(dòng)控制。高爐常規(guī)用的是PLC自動(dòng)控制。
爐頂稱(chēng)量料罐料空、料滿信號(hào)的控制可通過(guò)上位選擇來(lái)自雷達(dá)料位、料罐重量或采用時(shí)間方式。
2、均壓、排壓系統(tǒng)控制
a)均壓系統(tǒng)
高爐一次均壓采用半凈煤氣,二次均壓采用氮?dú)?。均壓工作制度有三種可供選擇:
1)一均常開(kāi)制
2)一均常關(guān)制
3)取消二次均壓制
在生產(chǎn)中根據(jù)生產(chǎn)狀況任選一種,常規(guī)使用一均常開(kāi)制
b)排壓系統(tǒng)
本高爐爐頂設(shè)有一個(gè)均壓放散閥和一個(gè)緊急放散閥,壓力正常放散使用均壓放散閥,緊急放散閥是在壓力料罐壓力高于爐頂壓力 0.015 ~ 0.02 MPa時(shí),自動(dòng)開(kāi)啟緊急放散閥,直到壓差降至 0.005 ~ 0.01 MPa自動(dòng)關(guān)閉緊急放散閥
3、爐頂無(wú)料鐘布料溜槽的控制
a、布料方式:
布料溜槽布料的方式有四種:環(huán)形布料、螺旋布料、扇形布料、定點(diǎn)布料
環(huán)形布料和螺旋布料為全自動(dòng)工作,扇形和定點(diǎn)布料為手動(dòng)啟動(dòng)后自動(dòng)工作
1)、環(huán)形布料:又分單環(huán)和多環(huán)布料。單環(huán)時(shí)傾動(dòng)角在一個(gè)固定的角度布料。多環(huán)布料是布料溜槽每轉(zhuǎn)過(guò)設(shè)定好的圈數(shù)后傾動(dòng)角上抬或下降到下一個(gè)設(shè)定角度布料,是常規(guī)布料方式。
2)、螺旋布料:是布料溜槽在作勻速的回轉(zhuǎn)(旋轉(zhuǎn)角)運(yùn)動(dòng),同時(shí)作徑向(傾動(dòng)角)運(yùn)動(dòng),而形成的變徑螺旋形爐料分布。其徑向運(yùn)動(dòng)是布料溜槽由外向里(也可以由里向外轉(zhuǎn)),改變傾角而獲得的,擺動(dòng)速度由慢變塊(或由快變慢)。這種布料方法能把爐料布到爐喉截面任一部位。
b、無(wú)料鐘布料溜槽的傾動(dòng)角(α角)控制
布料溜槽的傾動(dòng)角(α角)工作在10°至53°的范圍內(nèi),傾動(dòng)角的值預(yù)先設(shè)定,礦石和焦炭的角度可以分別設(shè)定,此次設(shè)計(jì)有五種料線高度的傾角,每種料線分為10等分。(詳見(jiàn)布料設(shè)定畫(huà)面)
c、無(wú)料鐘布料溜槽的旋轉(zhuǎn)角(β角)控制
當(dāng)程序判斷允許布料,探尺已提升到上部停尺零位時(shí),下密壓緊開(kāi)的命令一發(fā)出,布料溜槽根據(jù)程序判斷是正轉(zhuǎn)或反轉(zhuǎn)開(kāi)始啟動(dòng)。
當(dāng)布料完畢,下密壓緊關(guān)到位信號(hào)一來(lái),布料溜槽停止旋轉(zhuǎn)。同時(shí)下一罐料布料的起始位置,按要求步進(jìn)60°,對(duì)溜槽開(kāi)始布料的起始角(步進(jìn)角),程序有記憶,跟蹤功能,同時(shí)每次布料溜槽要到達(dá)步進(jìn)角的位置時(shí)(未取消步進(jìn)角),才能打開(kāi)料流調(diào)節(jié)閥布料
d、無(wú)料鐘料流調(diào)節(jié)閥的(γ角)控制
料流調(diào)節(jié)閥為液壓閥,工作范圍為0°-63°,用互為備用的兩路比例閥油路控制系統(tǒng),料流調(diào)節(jié)閥只有在下密封閥開(kāi)到位后才允許打開(kāi)到要求的角度,開(kāi)始布料,在料空信號(hào)發(fā)出后全開(kāi),開(kāi)到位后延時(shí)3s全關(guān)。
工藝要求布料溜槽在轉(zhuǎn)完設(shè)定環(huán)數(shù)的同時(shí),爐料要正好布完,因而對(duì)不同的爐料,不同的料批重量和不同的布料環(huán)數(shù),有不同的的下料速度,此下料速度需通過(guò)調(diào)節(jié)料流調(diào)節(jié)閥的開(kāi)度來(lái)達(dá)到。
2、料流調(diào)節(jié)閥的工作制度
1)、自動(dòng)選定角度:
根據(jù)每批料的重量和設(shè)定的布料圈數(shù)自動(dòng)計(jì)算出需要的下料速度值,然后與存儲(chǔ)在數(shù)據(jù)庫(kù)中的礦、焦料流曲線對(duì)比,自動(dòng)選定料流調(diào)節(jié)閥的開(kāi)度。選定后,該批料料流閥開(kāi)度不再改變,一直以該角度布料。
2)、調(diào)整下一罐料的料流調(diào)節(jié)閥開(kāi)度(自動(dòng)修正角度)
開(kāi)始選定角度的方法同自動(dòng)選定角度,但在每布完一批料后記下誤差,然后據(jù)此調(diào)整數(shù)據(jù)庫(kù)中同類(lèi)爐料的開(kāi)度,經(jīng)多次調(diào)整,誤差將逐漸減少。
3)、隨時(shí)調(diào)整料流調(diào)節(jié)閥的開(kāi)度
布料時(shí),不斷根據(jù)稱(chēng)重料罐的重量與剩余時(shí)間(剩余圈數(shù)*t)計(jì)算所需料流速度(公式1,圈數(shù)為剩余圈數(shù)),對(duì)照料流曲線速度表內(nèi)的礦、焦曲線設(shè)定好的料流調(diào)節(jié)閥的開(kāi)度與現(xiàn)在料流調(diào)節(jié)閥的實(shí)際開(kāi)度作比較,差值超過(guò)一定范圍(0.3°,可調(diào))時(shí),調(diào)整料流閥角度,最后保證布料溜槽轉(zhuǎn)完設(shè)定的圈數(shù)時(shí),爐料要正好布完,發(fā)出料空信號(hào)。
八. 結(jié)束語(yǔ)
【摘要】
目的研究微波大孔樹(shù)脂協(xié)同催化合成桂酸的新工藝。方法一定量的肉桂酸與一定量的異丁脂,在不同的條件下,以大孔樹(shù)脂為催化劑進(jìn)行微波合成實(shí)驗(yàn)。結(jié)果肉桂酸2 g,酸醇摩爾比1∶7,催化劑用量30%,微波功率600 W,微波溫度115℃,微波時(shí)間14 min,轉(zhuǎn)化率達(dá)89.3%。結(jié)論微波大孔樹(shù)脂協(xié)同催化合成肉桂酸異丁酯工藝,是快速、節(jié)能、對(duì)環(huán)境友好的綠色合成新工藝。
【關(guān)鍵詞】 肉桂酸異丁酯; 微波合成; 大孔樹(shù)脂; 催化
Abstract:Objective The microwave assisted synthesis(MAS) was integrated with macroporous resin catalysis(MRC) to prepare isobutyl cinnamate from cinnamic acid.MethodsThe preparation processes were investigated under different conditions.ResultsThe optimum synthetic conditions were 2 g cinnamic acid,microwave power was 600 W,reaction temperature was 115℃,reaction time was 14 min,mass percent of macroporous resin was 30%,the molar ratio of cinnamic acid to isobutyl alcohol was 1:7, and the yield of the new process was 89.3%.ConclusionThe new developed technology is rapid, economical and has no pollution.
Key words:Isobutyl cinnamate; Microwave assisted synthesis; Macroporous resin; Catalysis
肉桂酸異丁酯為無(wú)色液體,具有新鮮的果實(shí)香味,是一種重要的酯類(lèi)化合物,常用于食用香料和日化香料[1]。
目前肉桂酸酯的合成方法主要為傳統(tǒng)的加熱合成法,所用催化劑主要為濃硫酸等強(qiáng)酸。該法存在反應(yīng)時(shí)間長(zhǎng)、副反應(yīng)多、環(huán)境污染大和生產(chǎn)成本高等缺點(diǎn)[2]。微波輔助有機(jī)合成技術(shù)是近年來(lái)發(fā)展的新型綠色合成技術(shù),該技術(shù)具有選擇性高、耗時(shí)少、能耗低等優(yōu)點(diǎn),可克服傳統(tǒng)合成方法的缺陷,與相轉(zhuǎn)移催化合成等技術(shù)相比,適用面更廣,且設(shè)備投資不高,是目前國(guó)內(nèi)外有機(jī)合成的研究熱點(diǎn)[3]。大孔樹(shù)脂作為催化劑合成有機(jī)物目前在酯化反應(yīng)中有少量嘗試性應(yīng)用, 大孔樹(shù)脂催化合成具有價(jià)廉易得、可循環(huán)利用、反應(yīng)溫度低、與環(huán)境友好等優(yōu)點(diǎn)。目前有關(guān)微波-大孔樹(shù)脂協(xié)同催化合成的報(bào)道甚少,而微波-大孔樹(shù)脂協(xié)同催化合成肉桂酸異丁酯目前尚未見(jiàn)文獻(xiàn)報(bào)道,為此本文進(jìn)行了系統(tǒng)研究。
1 試劑與儀器
肉桂酸(上海雙香助劑廠,純度>99.5 %),肉桂酸異丁酯標(biāo)準(zhǔn)品[純度>98 %,森馨香精色素科技(中國(guó))有限公司],其它試劑(均為分析純,廣州化學(xué)試劑廠)。大孔樹(shù)脂(天津南開(kāi)大學(xué)化工廠)
WF-4000常壓微波快速反應(yīng)系統(tǒng)(上海屹堯儀器分析有限公司),WAY-1型阿貝折光儀(上海光學(xué)儀器廠),SHIMADZU-LC-MS-2010A型電噴霧質(zhì)譜儀(日本島津儀器公司)。
2 方法與結(jié)果
質(zhì)量為2 g的肉桂酸若干份,加入一定量的異丁醇和大孔樹(shù)脂放入微波反應(yīng)罐充分混和,分別在不同的工藝條件下做微波合成實(shí)驗(yàn)。反應(yīng)產(chǎn)物分別用10 %的碳酸鈉和飽和食鹽水洗滌后,分出的有機(jī)層用無(wú)水硫酸鎂干燥后蒸餾出異丁醇,得淡黃色透明液體產(chǎn)品,計(jì)算轉(zhuǎn)化率并作產(chǎn)品分析。
2.1 最佳反應(yīng)條件的選擇
2.1.1 催化劑的選擇
分別用CAT-601、LS-50和NKC-9型大孔樹(shù)脂在相同條件下催化合成肉桂酸異丁酯,產(chǎn)品轉(zhuǎn)化率分別為76.1%,71.2%, 86.1%,因此選用NKC-9大孔樹(shù)脂作催化劑。
2.1.2 微波輻射功率對(duì)轉(zhuǎn)化率的影響
設(shè)定肉桂酸2 g,異丁醇9 ml,NKC-9樹(shù)脂20%,微波溫度115℃,微波時(shí)間10 min,在不同的微波功率下反應(yīng)。結(jié)果見(jiàn)表1。表1 微波輻射功率對(duì)轉(zhuǎn)化率的影響(略)
由表1可知,隨著微波功率增大,肉桂酸的轉(zhuǎn)化率增大,這說(shuō)明微波功率對(duì)此合成反應(yīng)是強(qiáng)正相關(guān)的影響因素;在微波功率為600 W時(shí)轉(zhuǎn)化率最高,當(dāng)微波功率超過(guò)600 W時(shí)肉桂酸的轉(zhuǎn)化率反而下降,這可能是因?yàn)槲⒉üβ蔬^(guò)高造成部分異丁醇?xì)饣?,不利于液相的酯化反?yīng),所以確定微波的適宜功率為600W。
2.1.3 微波輻射溫度對(duì)轉(zhuǎn)化率的影響
設(shè)定肉桂酸2 g,異丁醇9 ml,NKC-9樹(shù)脂20 %,微波功率600 W,微波時(shí)間10 min,在不同的微波溫度下反應(yīng)。結(jié)果見(jiàn)表2。表2 微波輻射溫度對(duì)轉(zhuǎn)化率的影響略(
由表2可知,隨著微波溫度升高,肉桂酸的轉(zhuǎn)化率增大,這說(shuō)明微波溫度對(duì)此合成反應(yīng)是強(qiáng)正相關(guān)的影響因素;在微波溫度為115℃時(shí)轉(zhuǎn)化率最高,當(dāng)微波溫度超過(guò)115℃時(shí),肉桂酸的轉(zhuǎn)化率反而下降,這可能是因?yàn)闇囟冗^(guò)高一方面對(duì)作為催化劑的大孔樹(shù)脂的活性有負(fù)面影響,另一方面溫度過(guò)高也可能造成異丁醇?xì)饣?,所以確定微波的適宜溫度為115 ℃。
2.1.4 微波輻射時(shí)間對(duì)轉(zhuǎn)化率的影響設(shè)定肉桂酸2 g,異丁醇9 ml,NKC-9樹(shù)脂20 %,微波功率600 W,微波溫度115 ℃,在不同的微波時(shí)間下反應(yīng)。結(jié)果見(jiàn)表3。表3 微波輻射時(shí)間對(duì)轉(zhuǎn)化率的影響(略)
由表3可知,隨著微波時(shí)間延長(zhǎng),肉桂酸的轉(zhuǎn)化率增大,在微波時(shí)間為14 min時(shí)轉(zhuǎn)化率最高,當(dāng)微波時(shí)間超過(guò)14 min時(shí),肉桂酸的轉(zhuǎn)化率反而下降,這可能是因?yàn)槲⒉〞r(shí)間過(guò)長(zhǎng)可引起異丁醇脫水等副反應(yīng)從而降低了轉(zhuǎn)化率,所以確定微波的適宜時(shí)間為14 min。
2.1.5 酸醇摩爾比對(duì)轉(zhuǎn)化率的影響
設(shè)定肉桂酸2 g,NKC-9樹(shù)脂20 %,微波功率600 W,微波溫度115 ℃,微波時(shí)間14 min,在不同的酸醇比下反應(yīng)。結(jié)果見(jiàn)表4。表4 酸醇摩爾比對(duì)轉(zhuǎn)化率的影響(略)
由表4可知,隨著異丁醇用量的增大,肉桂酸的轉(zhuǎn)化率增大,這說(shuō)明增大反應(yīng)物量有利于酯化反應(yīng);酸醇的摩爾比為1∶7時(shí)轉(zhuǎn)化率最高,當(dāng)酸醇的摩爾比超過(guò)1∶7時(shí),肉桂酸的轉(zhuǎn)化率下降,這可能是因?yàn)楫惗〈加昧窟^(guò)大使反應(yīng)體系中肉桂酸濃度下降不利于酯化反應(yīng),所以確定適宜的酸醇摩爾比為1∶7。2.1.6 催化劑用量對(duì)轉(zhuǎn)化率的影響設(shè)定肉桂酸2 g,異丁醇9 ml,微波功率600 W,微波溫度115 ℃,微波時(shí)間14 min,在不同的催化劑用量下反應(yīng)。結(jié)果見(jiàn)表5。表5 催化劑用量對(duì)轉(zhuǎn)化率的影響(略)
由表5可知,催化劑用量從15 %增加到20 %時(shí),肉桂酸的轉(zhuǎn)化率增大增加明顯,從20 %增加到30 %時(shí)肉桂酸的轉(zhuǎn)化率增加變緩,催化劑用量為30 %時(shí)轉(zhuǎn)化率最高,當(dāng)催化劑用量超過(guò)30 %時(shí),肉桂酸的轉(zhuǎn)化率反而下降,所以確定適宜的催化劑用量為30 %。
2.2 最佳條件的重復(fù)實(shí)驗(yàn)在上述實(shí)驗(yàn)得出微波-大孔樹(shù)脂協(xié)同催化合成肉桂酸異丁酯的最佳條件下做轉(zhuǎn)化率重復(fù)實(shí)驗(yàn)。結(jié)果見(jiàn)表6。表6 最佳條件的重復(fù)實(shí)驗(yàn)結(jié)果(略)
由表6可知,5次重復(fù)實(shí)驗(yàn)的平均轉(zhuǎn)化率為89.1 %,標(biāo)準(zhǔn)偏差為1.77。
2.3 產(chǎn)品分析
2.3.1 折光率測(cè)定合成的肉桂酸異丁酯為淡黃色透明液體,產(chǎn)品易溶于醇和醚,不溶于水。在30 ℃下對(duì)肉桂酸異丁酯標(biāo)準(zhǔn)品進(jìn)行折光率測(cè)定,其折光率為1.536 2,相同條件下測(cè)定產(chǎn)品折光率為1.536 1,與標(biāo)準(zhǔn)品一致。
2.3.2 電噴霧質(zhì)譜將肉桂酸異丁酯產(chǎn)品溶于無(wú)水甲醇后作電噴霧質(zhì)譜,結(jié)果見(jiàn)圖1,主要分子離子峰歸屬如下(M=204.27):m/e 205 [M]+,m/e 237 [M+CH3OH]+,說(shuō)明所合成的產(chǎn)品為肉桂酸異丁酯。
3 結(jié)論
微波-大孔樹(shù)脂協(xié)同催化合成肉桂酸異丁酯的最佳工藝條件為:肉桂酸2 g,酸醇摩爾比1∶7,催化劑用量30 %,微波功率600 W,微波溫度115 ℃,微波時(shí)間14 min,轉(zhuǎn)化率可達(dá)89.3 %。
微波-大孔樹(shù)脂協(xié)同催化合成肉桂酸異丁酯的新工藝具有快速、節(jié)能、催化劑可循環(huán)利用和對(duì)環(huán)境友好等優(yōu)點(diǎn),符合當(dāng)今綠色化學(xué)的潮流,值得推廣應(yīng)用。
參考文獻(xiàn)
[1]許戈文,李布表.合成香料產(chǎn)品技術(shù)手冊(cè)[M].北京:中國(guó)商業(yè)出版社,1996:367.
【關(guān)鍵詞】通信工程;項(xiàng)目管理系統(tǒng);設(shè)計(jì)
1 引言
信息化技術(shù)的發(fā)展促進(jìn)了各個(gè)領(lǐng)域的進(jìn)步,如通信工程產(chǎn)業(yè)成為了經(jīng)濟(jì)發(fā)展的基礎(chǔ)支撐,影響著人們的生活。構(gòu)建通信工程項(xiàng)目管理系統(tǒng),是通信工程良好運(yùn)行的保障,能實(shí)現(xiàn)通信工程項(xiàng)目管理的自動(dòng)化、智能化和高效化。因而分析通信工程項(xiàng)目管理系統(tǒng)的需求、設(shè)計(jì)和實(shí)現(xiàn),對(duì)于提高其管理應(yīng)用的水平有著積極的意義。
2 通信工程項(xiàng)目管理的需求分析
通信工程項(xiàng)目管理的需求主要有功能需求、性能需求、運(yùn)行需求等,定義著通信工程項(xiàng)目管理系統(tǒng)的設(shè)計(jì)目標(biāo),以下做簡(jiǎn)要的分析。
2.1 功能需求分析
功能需求規(guī)劃著通信工程項(xiàng)目系統(tǒng)的基本服務(wù)能力,為進(jìn)度安排、投資、資源配制、跟蹤、風(fēng)險(xiǎn)分析等打下基礎(chǔ),功能需求的要求比較多,作為項(xiàng)目查詢和統(tǒng)計(jì)的必要支持,發(fā)揮著基礎(chǔ)的作用。功能需求主要有系統(tǒng)登錄、合同資金管理、項(xiàng)目立項(xiàng)管理、施工管理、工程管理、審計(jì)管理、物資采購(gòu)管理、用戶管理、系統(tǒng)設(shè)置管理等方面的內(nèi)容。精確定位通信工程項(xiàng)目管理系統(tǒng)的功能需求,對(duì)于其構(gòu)建有著重要的意義,便于建設(shè)高效、準(zhǔn)確的管理系統(tǒng),其工作的流程如下圖1所示。
圖1 系統(tǒng)管理功能分析
2.2 性能需求分析
性能需求分析要保證數(shù)據(jù)的精確度、兼容性兩個(gè)方面的內(nèi)容。兼容性:系統(tǒng)需要與操作性能相互兼容,如實(shí)現(xiàn)與windows、Linux、Unix等操作系統(tǒng)的兼容,滿足用戶對(duì)系統(tǒng)的實(shí)用和升級(jí)的要求,具備良好的適應(yīng)性。數(shù)據(jù)精確度:通信工程項(xiàng)目管理系統(tǒng)是一個(gè)工作管理的平臺(tái),要各項(xiàng)數(shù)據(jù)保證精確性,才能確保工作的流暢正確,如合同進(jìn)度安排精確、合同資金精確、施工統(tǒng)計(jì)查詢精確等,數(shù)據(jù)的精確性是保證性能的基礎(chǔ)。
2.3 運(yùn)行需求分析
運(yùn)行需求分析主要是軟硬件接口和用戶體驗(yàn)兩個(gè)方面,如軟硬件接口:硬件服務(wù)器實(shí)現(xiàn)對(duì)Windows、Linux、Unix等平臺(tái)下軟件的兼容,軟硬件的接口工作狀態(tài)穩(wěn)定。如用戶體驗(yàn)方面:系統(tǒng)自帶瀏覽器,用戶不需要安裝插件,登錄即可實(shí)現(xiàn)對(duì)管理系統(tǒng)的操作和訪問(wèn),并且操作功能齊全,可以在界面化的操作下完成。
2.4 其他需求分析
其他需求主要有安全可靠性需求和易用性需求,如安全可靠性需求:通信工程項(xiàng)目的管理系統(tǒng)要求具有較高的保密性和安全性,對(duì)于項(xiàng)目合同、項(xiàng)目數(shù)據(jù)等保護(hù)力度大,因而在設(shè)計(jì)系統(tǒng)時(shí),從用戶權(quán)限、登錄等方面要考慮相應(yīng)數(shù)據(jù)的安全性,為可靠性做出足夠的設(shè)計(jì)。系統(tǒng)的易用性需求:項(xiàng)目管理系統(tǒng)的使用者一般為普通的工作人員,信息化方面的技能并不高,因而要確保系統(tǒng)的易用性,如登錄簡(jiǎn)易、界面優(yōu)化等,需要保證一般的工作人員能很好的應(yīng)用該系統(tǒng)。
3 通信工程項(xiàng)目管理系統(tǒng)的設(shè)計(jì)
3.1 系統(tǒng)結(jié)構(gòu)的設(shè)計(jì)
系統(tǒng)結(jié)構(gòu)是系統(tǒng)的重要定義,可以看作是系統(tǒng)目標(biāo)下層的功能集合,對(duì)每個(gè)子系統(tǒng)還可以再分層,實(shí)現(xiàn)功能的細(xì)化,越下層的功能就越具體。系統(tǒng)結(jié)構(gòu)的設(shè)計(jì)頂層為宏觀定義,逐漸的分解細(xì)化,將每一個(gè)功能模塊分配到子系統(tǒng)中,按從屬關(guān)系進(jìn)行定義劃分。通信工程項(xiàng)目管理系統(tǒng)被分解為施工管理、合同資金管理、用戶管理、項(xiàng)目立項(xiàng)管理、審計(jì)管理、物資采購(gòu)管理、系統(tǒng)設(shè)置管理等。
3.2 系統(tǒng)功能模塊的設(shè)計(jì)
(1)系統(tǒng)登錄設(shè)計(jì):限制未授權(quán)或注冊(cè)用戶的權(quán)限,外網(wǎng)用戶登錄需要進(jìn)行身份驗(yàn)證,登錄的各項(xiàng)信息在后臺(tái)比對(duì)完整、正確后才能提交,否則將出現(xiàn)錯(cuò)誤提示,確保系統(tǒng)登錄的安全性。
(2)項(xiàng)目立項(xiàng)管理:一個(gè)項(xiàng)目申報(bào)、審核的完整流程,按照流程化的設(shè)計(jì)思路和方式進(jìn)行。
(3)合同資金管理:管理工程合同的資金,對(duì)財(cái)務(wù)進(jìn)行編碼,方便查詢和操作工程資金管理。
(4)施工管理:具備工程變更、開(kāi)工報(bào)告、停工申請(qǐng)、復(fù)工申請(qǐng)、工期調(diào)整、竣工驗(yàn)收申請(qǐng)等模塊。
(5)物資采購(gòu)管理:為了確保采購(gòu)的高效,主要有采購(gòu)任務(wù)管理、工程物料變更通知管理、工程用料招投標(biāo)管理等模塊。
(6)工程管理:有工程管理登錄、物料狀態(tài)查詢、施工任務(wù)、審核等模塊。
(7)審計(jì)管理:在管理系統(tǒng)中設(shè)置具體的流程,如施工方提交工程建設(shè)部門(mén),工程部門(mén)初審、復(fù)審,主管審核提交部門(mén)經(jīng)理,部門(mén)經(jīng)理提交總經(jīng)理,總經(jīng)理提交財(cái)務(wù)部門(mén)等一系列的程序。
3.3 數(shù)據(jù)庫(kù)的設(shè)計(jì)
數(shù)據(jù)庫(kù)的設(shè)計(jì)要建立在系統(tǒng)需求分析的基礎(chǔ)上,根據(jù)功能設(shè)計(jì),做出系統(tǒng)數(shù)據(jù)庫(kù)結(jié)構(gòu)的設(shè)計(jì),如部門(mén)信息表、部門(mén)主管信息表、員工信息表、項(xiàng)目分類(lèi)信息、項(xiàng)目信息表、物料采購(gòu)信息表、服務(wù)合同信息表、建設(shè)單位人員信息表、管理員信息表等。
4 通信工程項(xiàng)目管理系統(tǒng)的實(shí)現(xiàn)
通信工程項(xiàng)目管理系統(tǒng)的實(shí)現(xiàn)主要有系統(tǒng)的開(kāi)發(fā)環(huán)境、工程管理系統(tǒng)兩大內(nèi)容。
4.1 系統(tǒng)的開(kāi)發(fā)環(huán)境
要從軟硬件兩個(gè)方面進(jìn)行分析,也是系統(tǒng)開(kāi)發(fā)的基本要素,如系統(tǒng)的硬件環(huán)境:采用個(gè)人電腦虛擬服務(wù)器端進(jìn)行運(yùn)行,硬盤(pán)空間、內(nèi)存大小、CPU等都做了較為明確的規(guī)定,需要達(dá)到一定的硬件配置才能運(yùn)行。如在系統(tǒng)的開(kāi)發(fā)的軟件環(huán)境:采用個(gè)人電腦,操作系統(tǒng)一般為Windows7,數(shù)據(jù)庫(kù)和服務(wù)器都做了規(guī)定,某些特殊的需求下,也有運(yùn)用Linux或Unix等系統(tǒng)。
4.2 通信工程項(xiàng)目管理系統(tǒng)的實(shí)現(xiàn)
通過(guò)對(duì)通信工程項(xiàng)目管理的系統(tǒng)進(jìn)行需求分析和模塊設(shè)計(jì)之后,然后研究系統(tǒng)的實(shí)現(xiàn)。
(1)系統(tǒng)登錄頁(yè)面的實(shí)現(xiàn):頁(yè)面采用了Dreamweaver 10.0進(jìn)行,頁(yè)面的設(shè)計(jì)簡(jiǎn)潔明晰,CSS樣式統(tǒng)一了風(fēng)格,并對(duì)頁(yè)面進(jìn)行渲染。
(2)項(xiàng)目立項(xiàng)管理:登錄后,工作人員可以進(jìn)行項(xiàng)目受理、瀏覽、立項(xiàng)申請(qǐng)書(shū)的查看審核等,界面中有審核、通過(guò)等操作。
(3)合同資金管理實(shí)現(xiàn):通過(guò)接收、審核、財(cái)務(wù)編碼、合同憑證等功能,隨時(shí)查詢和了解相關(guān)的資料。
(4)施工管理:展開(kāi)菜單,如工程變更、停工、復(fù)工等,都可以在子菜單中點(diǎn)擊操作,并且可以隱藏。
(5)物資采購(gòu)管理實(shí)現(xiàn):進(jìn)入物資采購(gòu)管理子菜單,可以提交采購(gòu)計(jì)劃、審核等操作。
(6)工程管理實(shí)現(xiàn):用戶登錄后,有權(quán)限進(jìn)行施工管理的操作,如工程材料查詢、起草等。工程管理需要注重界面的優(yōu)化,便于工程人員操作。
(7)審計(jì)實(shí)現(xiàn):對(duì)憑證、文書(shū)等查看,進(jìn)行監(jiān)督。審計(jì)人員進(jìn)入系統(tǒng)需要一定的權(quán)限,可以對(duì)登錄的用戶進(jìn)行分類(lèi)管理,審計(jì)涉及到財(cái)務(wù)、工程資料等多方面的內(nèi)容,因而要做好保密性的工作。
5 結(jié)束語(yǔ)
通信工程項(xiàng)目管理系統(tǒng)對(duì)于通信工程而言具有重要的作用,信息化的工作方式能提高效率,減少資源的浪費(fèi),并且能很好的適應(yīng)復(fù)雜變化的市場(chǎng)環(huán)境。著手通行工程項(xiàng)目管理的系統(tǒng)設(shè)計(jì),并研究實(shí)現(xiàn)的方式,對(duì)于提高通信工程管理的水平和效益具有積極的作用。
參考文獻(xiàn):
[1]張迪.通信工程項(xiàng)目管理系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[J].電子科技大學(xué),2013.
1各項(xiàng)工作的定義
在移動(dòng)通信工程建設(shè)中包括較多的工作環(huán)節(jié),以下是網(wǎng)絡(luò)計(jì)劃技術(shù)對(duì)各環(huán)節(jié)工作的定義。第一,市場(chǎng)需求分析。市場(chǎng)需求分析主要是市場(chǎng)部針對(duì)市場(chǎng)的未來(lái)發(fā)展規(guī)劃所提出網(wǎng)絡(luò)容量的需求以及所覆蓋的需求,同時(shí)還有運(yùn)行維護(hù)部針對(duì)各種需求的維護(hù)所提出的網(wǎng)絡(luò)指標(biāo)。除此之外,還有客服部門(mén)針對(duì)用戶的不同投訴所提出的網(wǎng)絡(luò)覆蓋盲點(diǎn)。第二,可行性研究??尚行匝芯恐饕轻槍?duì)實(shí)際的市場(chǎng)需求進(jìn)行分析,并使用合理的網(wǎng)絡(luò)規(guī)劃與優(yōu)化的軟件對(duì)網(wǎng)絡(luò)進(jìn)行設(shè)計(jì)。其中分析的主要內(nèi)容就是話務(wù)的分布均勻與否,利用網(wǎng)絡(luò)優(yōu)化解決還是增加基站解決。與此同時(shí),還應(yīng)對(duì)其實(shí)際的經(jīng)濟(jì)效益進(jìn)行全面的分析。第三,初步設(shè)計(jì)。初步設(shè)計(jì)主要是基于對(duì)市場(chǎng)需求的分析以及可行性的研究上,需要由專(zhuān)業(yè)的設(shè)計(jì)單位進(jìn)行設(shè)計(jì),并進(jìn)行科學(xué)正確的施工指導(dǎo)。第四,系統(tǒng)初驗(yàn)。在完成系統(tǒng)的割接以后,需要由工程建設(shè)的相關(guān)部門(mén)進(jìn)行組織,并采取公司驗(yàn)收小組的方式對(duì)系統(tǒng)工程的實(shí)體與檔案的歸檔工作進(jìn)行驗(yàn)收。第五,系統(tǒng)試運(yùn)行。完成系統(tǒng)初驗(yàn)以后,運(yùn)行維護(hù)部門(mén)可以在已經(jīng)割接入網(wǎng)的設(shè)備進(jìn)行一定的維護(hù),并且及時(shí)的記錄在實(shí)際運(yùn)行過(guò)程中的問(wèn)題,針對(duì)問(wèn)題進(jìn)行及時(shí)的解決與處理。第六,系統(tǒng)終驗(yàn)。在系統(tǒng)完成試運(yùn)行以后,與工程建設(shè)移動(dòng)通信相關(guān)部門(mén)進(jìn)行試運(yùn)行過(guò)程中發(fā)現(xiàn)的問(wèn)題。第七,財(cái)務(wù)結(jié)算。財(cái)務(wù)結(jié)算就是企業(yè)內(nèi)部的財(cái)務(wù)部門(mén)針對(duì)相關(guān)的工程結(jié)算要求,工程的建設(shè)部門(mén)與運(yùn)行維護(hù)的部門(mén)將設(shè)備移交,并由工程的建設(shè)部門(mén)完成到貨的證明以及相關(guān)文件。財(cái)務(wù)部將整體工程建設(shè)的總額進(jìn)行結(jié)算,并上報(bào)給上級(jí)的主管部門(mén)[4]。第八,竣工驗(yàn)收。對(duì)所完成建設(shè)的工程進(jìn)行實(shí)體的驗(yàn)收,并對(duì)竣工的文檔以及財(cái)務(wù)的結(jié)算進(jìn)行綜合性的驗(yàn)收。
2合理編寫(xiě)制定移動(dòng)通信工程建設(shè)的工作表
在完成對(duì)移動(dòng)通信工程建設(shè)各環(huán)節(jié)的工作定義后,能夠根據(jù)相應(yīng)的邏輯關(guān)系編制各環(huán)節(jié)工作的關(guān)系表,并確定各環(huán)節(jié)工作的正確順序。完成工作定義以后,需要編制工作的清單,其中內(nèi)容需要包括項(xiàng)目全部的工作內(nèi)容,并進(jìn)行各項(xiàng)工作的詳細(xì)文字說(shuō)明,這樣才能保證項(xiàng)目?jī)?nèi)容的完整與準(zhǔn)確,并能夠合理的對(duì)各項(xiàng)工作進(jìn)行了解。
3科學(xué)繪制移動(dòng)通信工程建設(shè)的網(wǎng)絡(luò)圖
3.1工程建設(shè)整體的網(wǎng)絡(luò)圖針對(duì)移動(dòng)通信工程的邏輯關(guān)系表可以準(zhǔn)確的繪制出整體的網(wǎng)絡(luò)圖,如圖一。
3.2工程建設(shè)的子網(wǎng)絡(luò)圖針對(duì)以上工程建設(shè)整體的網(wǎng)絡(luò)圖可以將其分為四個(gè)模塊,主要是初步設(shè)計(jì)、設(shè)備采購(gòu)、基站單項(xiàng)工程與傳輸單項(xiàng)工程。除基站單項(xiàng)工程外,將其他三個(gè)模塊分別進(jìn)行子網(wǎng)絡(luò)圖的繪制[5]。繪制圖表如圖二、三、四。
4依據(jù)工程建設(shè)整體路線計(jì)算工程完成日期
根據(jù)以上整體網(wǎng)絡(luò)圖以及子網(wǎng)絡(luò)圖進(jìn)行分析,可以判定工程建設(shè)需要進(jìn)行330天[6]。在經(jīng)過(guò)科學(xué)合理的可行性分析后,可以啟動(dòng)初步設(shè)計(jì)與基站單項(xiàng)工程以及傳輸線路工程三部分。因此,對(duì)移動(dòng)通信工程建設(shè)工期的優(yōu)化,最重要的就是突破網(wǎng)絡(luò)圖的關(guān)系,進(jìn)而使各環(huán)節(jié)的工作進(jìn)行有效的銜接。
5結(jié)束語(yǔ)
所謂通信工程項(xiàng)目的質(zhì)量管理,就是指在通信工程項(xiàng)目施工的整體過(guò)程中,包括項(xiàng)目施工前、施工過(guò)程以及工程完工之后的后續(xù)質(zhì)量保證全過(guò)程中,嚴(yán)格遵守國(guó)家關(guān)于通信工程項(xiàng)目的有關(guān)規(guī)定,充分運(yùn)用通信工程方面的知識(shí)以及管理學(xué)方面的知識(shí)來(lái)確保工程質(zhì)量達(dá)標(biāo),使其符合經(jīng)濟(jì)上、質(zhì)量上以及性能上的一系列要求。通信工程項(xiàng)目的質(zhì)量問(wèn)題不僅關(guān)系到通信網(wǎng)絡(luò)通暢使用,同時(shí)也決定著通信企業(yè)的生存和發(fā)展,因此,有效確保通信工程項(xiàng)目的質(zhì)量不僅對(duì)于通信企業(yè)的發(fā)展來(lái)說(shuō)至關(guān)重要,同時(shí)對(duì)于整個(gè)社會(huì)的通信使用和發(fā)展同樣具有重要的意義,隨著我國(guó)對(duì)外開(kāi)放水平的不斷提高,我國(guó)通信企業(yè)也面臨著來(lái)自國(guó)外通信企業(yè)的激烈的競(jìng)爭(zhēng),因此,通信企業(yè)要想在激烈的通信市場(chǎng)上保持不敗之地,就必須高度重視起通信工程項(xiàng)目的質(zhì)量問(wèn)題,這不管是對(duì)于我國(guó)通信產(chǎn)業(yè)來(lái)說(shuō)還是對(duì)于每一個(gè)通信企業(yè)來(lái)說(shuō)都具有強(qiáng)烈的現(xiàn)實(shí)意義。
二、我國(guó)通信工程項(xiàng)目質(zhì)量管理現(xiàn)狀分析
當(dāng)前我國(guó)通信工程項(xiàng)目質(zhì)量管理所存在的問(wèn)題主要表現(xiàn)在以下幾個(gè)方面:
1.在項(xiàng)目的立項(xiàng)過(guò)程中,對(duì)該項(xiàng)目缺乏明確科學(xué)的分析和評(píng)估。在立項(xiàng)之前往往沒(méi)有經(jīng)過(guò)細(xì)致嚴(yán)格的調(diào)研就匆忙立項(xiàng),對(duì)整個(gè)項(xiàng)目的資金技術(shù)投入、人員配置、成本等較為盲目,對(duì)整個(gè)項(xiàng)目的可行性缺乏深入理解和調(diào)研,導(dǎo)致不少項(xiàng)目無(wú)故浪費(fèi)了大量的人力物力等。
2.通信工程項(xiàng)目質(zhì)量管理的專(zhuān)業(yè)人才較為匱乏。近年來(lái)我國(guó)通信產(chǎn)業(yè)發(fā)展很快,通信工程項(xiàng)目隨之增多,但是與此同時(shí)通信工程項(xiàng)目質(zhì)量管理的專(zhuān)業(yè)人員的數(shù)量和質(zhì)量卻跟不上通信產(chǎn)業(yè)發(fā)展的速度,人員的缺乏導(dǎo)致針對(duì)通信工程現(xiàn)場(chǎng)的監(jiān)理、相關(guān)制度的執(zhí)行等方面都出現(xiàn)了問(wèn)題,直接導(dǎo)致工程項(xiàng)目質(zhì)量出現(xiàn)問(wèn)題。
3.工程項(xiàng)目實(shí)施過(guò)程中缺乏貫穿始終的嚴(yán)格的制度保證。由于不能很好地執(zhí)行通信工程項(xiàng)目施工過(guò)程中的規(guī)定,使得不少通信工程項(xiàng)目在施工之前就已經(jīng)埋下了質(zhì)量隱患,不少施工公司在取得施工資格之后,經(jīng)常不自己進(jìn)行施工而是將施工任務(wù)轉(zhuǎn)手承包給一些資質(zhì)并不高的施工單位進(jìn)行施工,自己從中坐收漁利,而這些資質(zhì)并不高的施工隊(duì)的施工質(zhì)量、人員素質(zhì)等并不能得到很好的保障,導(dǎo)致工程項(xiàng)目質(zhì)量漏洞百出。
4.一些通信工程的監(jiān)理單位和設(shè)計(jì)單位同樣存在嚴(yán)重的問(wèn)題。例如一些監(jiān)理人員缺乏嚴(yán)格的責(zé)任意識(shí)和敬業(yè)意識(shí),不能很好地履行監(jiān)理人員的職責(zé)將一些潛在的質(zhì)量問(wèn)題及時(shí)發(fā)現(xiàn),設(shè)計(jì)人員進(jìn)行工程設(shè)計(jì)時(shí)脫離施工現(xiàn)場(chǎng)實(shí)際情況等都最終導(dǎo)致工程質(zhì)量在完工后出現(xiàn)問(wèn)題。
三、通信工程項(xiàng)目質(zhì)量管理對(duì)策
1.施工前:在這一階段,設(shè)計(jì)部門(mén)要充分做好充分的調(diào)查工作,在充分的調(diào)查的基礎(chǔ)上評(píng)估該項(xiàng)目的可信性和科學(xué)性,進(jìn)行項(xiàng)目設(shè)計(jì)的過(guò)程中要充分深入施工現(xiàn)場(chǎng)進(jìn)行調(diào)查,在進(jìn)行了科學(xué)的施工前設(shè)計(jì)后要將設(shè)計(jì)方案交給施工單位和監(jiān)理單位,使得他們深入理解施工意圖和理念,明確各自的職責(zé)以便更有效地投入到施工中去。
2.施工中:這一過(guò)程是有效控制通信工程質(zhì)量的核心環(huán)節(jié),在施工過(guò)程中,施工單位要使用擁有最好技術(shù)的工人進(jìn)行作業(yè),在材料使用、施工步驟等方面要嚴(yán)格按照事先規(guī)定的設(shè)計(jì)圖紙進(jìn)行,同時(shí)在這一過(guò)程中監(jiān)理單位要充分發(fā)揮自身作用,嚴(yán)格現(xiàn)場(chǎng)監(jiān)理,進(jìn)行施工全過(guò)程的監(jiān)理體系,進(jìn)一步提高施工質(zhì)量。
3.施工后:在通信工程完工之后,相關(guān)監(jiān)理單位要嚴(yán)格按照相關(guān)規(guī)定和技術(shù)指標(biāo)對(duì)工程進(jìn)行嚴(yán)格的現(xiàn)場(chǎng)驗(yàn)收,尤其是要對(duì)工程的重點(diǎn)部分更好重點(diǎn)進(jìn)行質(zhì)量檢測(cè),對(duì)發(fā)現(xiàn)問(wèn)題的部分要嚴(yán)格責(zé)令施工方重新進(jìn)行施工直到達(dá)到規(guī)定指標(biāo)。
四、總結(jié)
關(guān)鍵詞:通信工程;實(shí)訓(xùn)模擬系統(tǒng);管理
當(dāng)今社會(huì)需要的工程管理模式是一種高效的管理模式。其中,通信工程模式是一項(xiàng)保障通信基礎(chǔ)設(shè)施建設(shè)的重要方式,在我國(guó)的通信系統(tǒng)管理過(guò)程中仍然存在許多問(wèn)題,即管理過(guò)程中一些人為的因素影響了效果,有些任務(wù)的責(zé)任不夠明確,工作的推諉和種種個(gè)人原因影響了工作進(jìn)度,信息共享程度也比較差,從信息的匯總到后期的查詢處在比較落后的階段,在很大程度上降低了工程管理效率。為此,急需設(shè)計(jì)一款通信工程管理實(shí)訓(xùn)系統(tǒng),該系統(tǒng)基于管理的工作流程以及核心的業(yè)務(wù)處理模塊,對(duì)通信工程項(xiàng)目管理中的各項(xiàng)工作內(nèi)容進(jìn)行了優(yōu)化和分解,可以模擬實(shí)現(xiàn)通信工程中各個(gè)階段的內(nèi)容:前期階段、設(shè)計(jì)階段、投標(biāo)和招標(biāo)階段、實(shí)施階段、監(jiān)理階段、驗(yàn)收階段。從而可以改善學(xué)校通信工程專(zhuān)業(yè)的實(shí)驗(yàn)教學(xué)環(huán)境,讓理論知識(shí)可以很好地和通信工程真實(shí)項(xiàng)目對(duì)接,增加實(shí)際動(dòng)手能力,提高實(shí)驗(yàn)教學(xué)的質(zhì)量。
1項(xiàng)目管理系統(tǒng)性概念以及功能介紹
1.1通信工程項(xiàng)目管理實(shí)訓(xùn)系統(tǒng)的概念
通信工程學(xué)生項(xiàng)目管理實(shí)訓(xùn)系統(tǒng)是一個(gè)將通信工程項(xiàng)目的實(shí)際流程情況按照模塊化的方式分解成幾個(gè)獨(dú)立的管理流程,根據(jù)通信工程中包含的招投標(biāo)實(shí)務(wù)以及工程監(jiān)理實(shí)務(wù)和項(xiàng)目管理等相關(guān)課程的基本要求來(lái)完成相應(yīng)的開(kāi)發(fā)和業(yè)務(wù)的配置。將前期的可行性研究、項(xiàng)目招投標(biāo)、項(xiàng)目設(shè)計(jì)、實(shí)施以及項(xiàng)目驗(yàn)收等工作流程轉(zhuǎn)化成系統(tǒng)實(shí)訓(xùn)子項(xiàng)目,形成一個(gè)整體流程,讓通信工程專(zhuān)業(yè)的學(xué)生可以通過(guò)平時(shí)在實(shí)驗(yàn)室的實(shí)際操作和項(xiàng)目跟蹤,更為清楚地掌握所學(xué)通信工程項(xiàng)目管理的實(shí)際工作流程,同時(shí)也能提高項(xiàng)目管理的相關(guān)業(yè)務(wù)能力。
1.2通信工程項(xiàng)目管理系統(tǒng)的功能概述
通信工程項(xiàng)目管理系統(tǒng)集合當(dāng)下常見(jiàn)的OA辦公、工作流、業(yè)務(wù)模型、過(guò)程管理、進(jìn)度管理、成本管理、PDA于一體,運(yùn)用C/S和B/S雙模式開(kāi)發(fā),輕松建立工程項(xiàng)目管理平臺(tái),系統(tǒng)支持局域網(wǎng)、本地網(wǎng)絡(luò)、廣域網(wǎng)以及互聯(lián)網(wǎng),管理者可以隨時(shí)隨地地對(duì)項(xiàng)目進(jìn)行跟蹤和管理。
1.3簡(jiǎn)單解析系統(tǒng)結(jié)構(gòu)
系統(tǒng)以項(xiàng)目的實(shí)際流程進(jìn)度為主體,以項(xiàng)目工程進(jìn)度、項(xiàng)目施工成本、業(yè)務(wù)合同管理為主要中心模塊,整合常規(guī)個(gè)人辦公、項(xiàng)目分包管理、業(yè)務(wù)材料管理、工程機(jī)械設(shè)備管理以及項(xiàng)目人員管理,相當(dāng)于整個(gè)系統(tǒng)都是按照項(xiàng)目對(duì)應(yīng)的流程和需求進(jìn)行開(kāi)發(fā)設(shè)計(jì),通過(guò)實(shí)際項(xiàng)目中各階層的權(quán)限、業(yè)務(wù)權(quán)限進(jìn)行分工協(xié)作,與此同時(shí),可以通過(guò)工作流程讓操作者對(duì)項(xiàng)目業(yè)務(wù)進(jìn)行工作審批。系統(tǒng)中包括了普通企業(yè)通用管理模塊,而對(duì)于項(xiàng)目業(yè)務(wù)進(jìn)度的跟蹤,本文采用最先進(jìn)的EXCEL工作流表單定制技術(shù),使用更方便,支持學(xué)生二次開(kāi)發(fā)。
1.4實(shí)際操作優(yōu)勢(shì)
第一,可以對(duì)分包商情況、每筆費(fèi)用使用情況、供應(yīng)商情況、員工情況進(jìn)行系統(tǒng)查詢。第二,管理者可以通過(guò)這個(gè)系統(tǒng)的跟蹤和安排,實(shí)時(shí)了解各項(xiàng)目的動(dòng)態(tài)情況。第三,員工可以通過(guò)系統(tǒng)功能模塊中的崗位設(shè)置,實(shí)現(xiàn)虛擬權(quán)限以及工作過(guò)程的信息化,不需要紙張辦公,大大地提高了工作效率,并且可以牢牢把控項(xiàng)目的進(jìn)度、發(fā)展?fàn)顩r和未來(lái)趨勢(shì)。第四,本身具有很強(qiáng)的專(zhuān)業(yè)性和項(xiàng)目適應(yīng)性。自定義的系統(tǒng)模塊設(shè)計(jì)添加,可以按項(xiàng)目需求進(jìn)行配置實(shí)施,快速幫助操作者進(jìn)入全新的網(wǎng)絡(luò)項(xiàng)目管理中。
2網(wǎng)絡(luò)數(shù)據(jù)傳輸與同步問(wèn)題
2.1網(wǎng)絡(luò)數(shù)據(jù)的運(yùn)用
基本數(shù)據(jù)在項(xiàng)目中的安全、快速、同步的問(wèn)題,將以項(xiàng)目的數(shù)據(jù)庫(kù)配置以及項(xiàng)目的運(yùn)行環(huán)境,同時(shí)基于局域網(wǎng)絡(luò)、互聯(lián)網(wǎng)絡(luò),以此實(shí)現(xiàn)項(xiàng)目數(shù)據(jù)的安全管理。項(xiàng)目研發(fā)數(shù)據(jù)傳輸方式一:對(duì)于網(wǎng)速很慢、網(wǎng)絡(luò)不是很穩(wěn)定等情況,可以采用定期傳輸數(shù)據(jù)的方式,通過(guò)U盤(pán)或者數(shù)據(jù)線,定期生產(chǎn)離線包上傳到總部服務(wù)器數(shù)據(jù)庫(kù)進(jìn)行同步,同時(shí)子系統(tǒng)中實(shí)現(xiàn)數(shù)據(jù)的同步刷新。項(xiàng)目研發(fā)數(shù)據(jù)傳輸方式二:使用互聯(lián)網(wǎng)進(jìn)行管理,遇到網(wǎng)絡(luò)不好的問(wèn)題,可以采用本地運(yùn)行模式。系統(tǒng)采用三層架構(gòu)的C/S模式開(kāi)發(fā),客戶端可以實(shí)現(xiàn)數(shù)據(jù)的緩存和業(yè)務(wù)邏輯,客戶端能夠安全、快速地訪問(wèn)系統(tǒng)數(shù)據(jù)。項(xiàng)目研發(fā)數(shù)據(jù)傳輸方式三:對(duì)于網(wǎng)速好的,可以使用普通模式訪問(wèn)服務(wù)器端的數(shù)據(jù),隨時(shí)隨地同步跟蹤觀察即可。項(xiàng)目研發(fā)數(shù)據(jù)傳輸方式四:參考華為大數(shù)據(jù)處理模式,采用分布式數(shù)據(jù)儲(chǔ)存進(jìn)行數(shù)據(jù)處理。
2.2基于工作過(guò)程通信工程項(xiàng)目管理實(shí)訓(xùn)系統(tǒng)集成
針對(duì)工程材料管理的特殊要求以及辦公資料的需要,系統(tǒng)可以與PDA掃描設(shè)備進(jìn)行數(shù)據(jù)連接,用戶只需手持PDA掃描設(shè)備就可以進(jìn)行材料的入庫(kù)、出庫(kù)及盤(pán)點(diǎn)。同時(shí)對(duì)項(xiàng)目資料的打印和下載起到快捷方便的作用。PDA掃描設(shè)備可以通過(guò)GPRS網(wǎng)絡(luò)以及數(shù)據(jù)線連接等方式,導(dǎo)入到數(shù)據(jù)系統(tǒng)中實(shí)現(xiàn)系統(tǒng)的智能化。對(duì)于類(lèi)似于供應(yīng)商的管理,可以提供B/S架構(gòu)的訂單模式,供應(yīng)商直接在網(wǎng)上提交單據(jù)。用戶只需查詢審核并且導(dǎo)入到系統(tǒng)中就可以實(shí)現(xiàn)自動(dòng)存儲(chǔ)。數(shù)據(jù)接口,系統(tǒng)可以導(dǎo)入Excel數(shù)據(jù),直接生成表單,也可以直接導(dǎo)入Excel數(shù)據(jù)格式,方便在外地或者單機(jī)模式下也可以對(duì)項(xiàng)目進(jìn)行調(diào)度管理。
2.3系統(tǒng)特點(diǎn)
(1)C/S框架下采用windowsform設(shè)計(jì),數(shù)據(jù)庫(kù)支持sqlserver和oracle等大型數(shù)據(jù)庫(kù),系統(tǒng)簡(jiǎn)潔,操作簡(jiǎn)單,上手快,易用性強(qiáng),學(xué)習(xí)者不用專(zhuān)門(mén)學(xué)習(xí)也能了解和使用。(2)采用Excel計(jì)算公式嵌入技術(shù),管理界面更美觀,業(yè)務(wù)功能更強(qiáng)大,使用更方便,一個(gè)流程或是數(shù)據(jù)的工作就是一個(gè)簡(jiǎn)單的表單,沒(méi)有復(fù)雜界面,實(shí)現(xiàn)異步數(shù)據(jù)開(kāi)發(fā),大大降低了業(yè)務(wù)之間的耦合。(3)融OA辦公、工作流、業(yè)務(wù)模型、過(guò)程管理、進(jìn)度管理、PDA、成本管理于一體,管理員根本無(wú)需增加別的辦公軟件就可以實(shí)現(xiàn)項(xiàng)目的管理功能,真正的一鍵式操作管理。(4)超強(qiáng)的兼容性,完全兼容Excel,可以導(dǎo)入及導(dǎo)出Excel,生成PDF文檔,同時(shí)對(duì)于電腦的兼容也極強(qiáng),能應(yīng)用于windowsXP,win7,windowsserver系列,同時(shí)支持Linux和MAC系統(tǒng)。(5)工作流程不死板,可以自定義工作流程,實(shí)現(xiàn)了工作的無(wú)縫安排、自主跟蹤和驗(yàn)收,做到了真正的系統(tǒng)辦公,讓管理者管理時(shí)更輕松、有效。(6)完美強(qiáng)大的報(bào)表功能,可以對(duì)表單進(jìn)行直接輸出、標(biāo)準(zhǔn)報(bào)表、三聯(lián)報(bào)表等,配合打印功能。(7)高性能,基本采用富客戶端的理念進(jìn)行設(shè)計(jì),服務(wù)器端更多承受數(shù)據(jù)的壓力,保障了軟件的穩(wěn)定性。
2.4權(quán)限分工協(xié)議
(1)用戶操作權(quán)限:添加、修改、刪除、輸出權(quán)限,授權(quán)用戶擁有權(quán)限分組功能,同時(shí)任何操作記錄都會(huì)生成在管理日志(最高級(jí)可見(jiàn))。(2)項(xiàng)目管理權(quán)限:授權(quán)用戶可以對(duì)應(yīng)訪問(wèn)的項(xiàng)目,每個(gè)角色都有對(duì)應(yīng)的授權(quán),采用用戶組權(quán)限管理系統(tǒng)進(jìn)行權(quán)限限制。(3)審批流程:對(duì)定義的不同的表單擁有相應(yīng)的審批流程,實(shí)現(xiàn)數(shù)據(jù)的工作流同步管理。(4)系統(tǒng)模塊權(quán)限:授權(quán)用戶可以使用的對(duì)應(yīng)模塊,以組為單位建立模塊權(quán)限。
2.5主要模塊
2.5.1人員管理模塊
員工檔案:?jiǎn)T工信息、個(gè)人經(jīng)歷、證照列表、培訓(xùn)記錄、獎(jiǎng)勵(lì)記錄等員工基本信息。用戶資料:用戶組權(quán)限系統(tǒng)分配定義、用戶的添加和刪除功能。員工工資:項(xiàng)目中員工工資的計(jì)算、統(tǒng)計(jì)記錄以及發(fā)放情況的統(tǒng)計(jì)。
2.5.2個(gè)人辦公模塊
包括個(gè)人總結(jié)計(jì)劃、項(xiàng)目動(dòng)態(tài)、工作流程、文件通知、請(qǐng)假日志、工作任務(wù)分配。
2.5.3合同管理模塊
合同信息:各種項(xiàng)目設(shè)計(jì)到的合同電子檔和管理。合同執(zhí)行:各種合同變更和合同記錄功能。
2.5.4材料管理模塊
庫(kù)存管理:對(duì)倉(cāng)庫(kù)進(jìn)行盤(pán)點(diǎn)、計(jì)算、庫(kù)存查詢。材料計(jì)劃管理:材料預(yù)算計(jì)劃、采購(gòu)計(jì)劃、庫(kù)存預(yù)警等。材料購(gòu)買(mǎi)合同:對(duì)材料合同進(jìn)行追蹤管理,材料入庫(kù)、出庫(kù)損耗管理、材料結(jié)算以及實(shí)時(shí)材料。工具管理:工程使用工具的統(tǒng)計(jì)和租借管理。
2.5.5資料管理模塊
可以自動(dòng)生成合格的評(píng)定數(shù)據(jù)和不合格數(shù)據(jù),自動(dòng)匯總表格,自動(dòng)管理表格,自動(dòng)評(píng)定意見(jiàn),匯總分部及子分部,并且可以保證表格與統(tǒng)一用表書(shū)籍一致。提供了表格填寫(xiě)范例、填表說(shuō)明、條目說(shuō)明等使用教程。資料網(wǎng)絡(luò)同步化管理,可以多人聯(lián)網(wǎng)在線協(xié)同編制資料,同時(shí)項(xiàng)目經(jīng)理及監(jiān)理可以隨時(shí)進(jìn)入審批??梢宰约航⒛夸洠L制任意表格,復(fù)制表格,添加表格,復(fù)制表格,外部導(dǎo)入Excel,導(dǎo)出Word,導(dǎo)出Excel\PDF,編排表格順序等。選擇相關(guān)單元格系統(tǒng)可以自動(dòng)按要求生成圖形。內(nèi)含專(zhuān)業(yè)的技術(shù)及素材和施工組織設(shè)計(jì)方案作參考。
2.5.6項(xiàng)目財(cái)務(wù)管理模塊
通過(guò)付款單方式,對(duì)上述發(fā)生支出應(yīng)付款進(jìn)行支付。通過(guò)收款單方式,對(duì)工程上的收入項(xiàng)目進(jìn)行入賬。工程成本、人員成本、材料成本、機(jī)械成本、各種支出分析以及收入動(dòng)態(tài)生成分析。系統(tǒng)可以自動(dòng)生成相關(guān)應(yīng)付款日志、收款日志等財(cái)務(wù)交易信息。借款賬單、還款賬單、存款賬單對(duì)財(cái)務(wù)日常的資金進(jìn)行記錄。
2.5.7機(jī)械化設(shè)備管理模塊
設(shè)備信息、設(shè)備維修、設(shè)備的配件管理、設(shè)備借出借入、設(shè)備驗(yàn)收、設(shè)備折舊等管理。機(jī)械設(shè)備在工程中的使用情況,進(jìn)場(chǎng)、出場(chǎng)、租用情況的管理。
3結(jié)語(yǔ)
通過(guò)該系統(tǒng),能夠更好地在教學(xué)中模擬實(shí)際通信工程項(xiàng)目監(jiān)理中的任務(wù)管理,讓學(xué)生對(duì)通信工程管理工作流程更加清晰、明確,系統(tǒng)中也另外包含了考核模塊,包含上傳作業(yè)、批改作業(yè)、批量下載功能等,充分發(fā)揮了學(xué)生和教師之間的學(xué)習(xí)互動(dòng)。當(dāng)然,該系統(tǒng)也存在著一些不足。因?yàn)橥ㄐ殴こ痰淖詣?dòng)化系統(tǒng)的設(shè)計(jì)和完善是一個(gè)非常復(fù)雜的大工程。大企業(yè)的各個(gè)部門(mén)在實(shí)際工作中還有更復(fù)雜的邏輯關(guān)系,特別是在系統(tǒng)的設(shè)計(jì)和完善過(guò)程中需要更細(xì)致的規(guī)劃工作。即便如此,它對(duì)于在校學(xué)生來(lái)說(shuō)也是一個(gè)不可或缺的實(shí)訓(xùn)模擬的寶貴資源。
[參考文獻(xiàn)]
[1]黃蘭,張優(yōu)里.基于工作過(guò)程的通信工程項(xiàng)目管理實(shí)訓(xùn)系統(tǒng)[J].實(shí)驗(yàn)技術(shù)與管理,2015(2):145-148.
[2]向科.項(xiàng)目驅(qū)動(dòng)教學(xué)模式下的網(wǎng)絡(luò)工程實(shí)訓(xùn)室設(shè)計(jì)與實(shí)現(xiàn)[D].成都:電子科技大學(xué),2013.
[3]張迪.通信工程項(xiàng)目管理系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[D].成都:電子科技大學(xué),2013.
關(guān)鍵詞:通信工程;實(shí)訓(xùn)模擬系統(tǒng);管理
當(dāng)今社會(huì)需要的工程管理模式是一種高效的管理模式。其中,通信工程模式是一項(xiàng)保障通信基礎(chǔ)設(shè)施建設(shè)的重要方式,在我國(guó)的通信系統(tǒng)管理過(guò)程中仍然存在許多問(wèn)題,即管理過(guò)程中一些人為的因素影響了效果,有些任務(wù)的責(zé)任不夠明確,工作的推諉和種種個(gè)人原因影響了工作進(jìn)度,信息共享程度也比較差,從信息的匯總到后期的查詢處在比較落后的階段,在很大程度上降低了工程管理效率。為此,急需設(shè)計(jì)一款通信工程管理實(shí)訓(xùn)系統(tǒng),該系統(tǒng)基于管理的工作流程以及核心的業(yè)務(wù)處理模塊,對(duì)通信工程項(xiàng)目管理中的各項(xiàng)工作內(nèi)容進(jìn)行了優(yōu)化和分解,可以模擬實(shí)現(xiàn)通信工程中各個(gè)階段的內(nèi)容:前期階段、設(shè)計(jì)階段、投標(biāo)和招標(biāo)階段,實(shí)施階段、監(jiān)理階段、驗(yàn)收階段。從而可以改善學(xué)校通信工程專(zhuān)業(yè)的實(shí)驗(yàn)教學(xué)環(huán)境,讓理論知識(shí)可以很好地和通信工程真實(shí)項(xiàng)目對(duì)接,增加實(shí)際動(dòng)手能力,提高實(shí)驗(yàn)教學(xué)的質(zhì)量。
1項(xiàng)目管理系統(tǒng)性概念以及功能介紹
1.1通信工程項(xiàng)目管理實(shí)訓(xùn)系統(tǒng)的概念
通信工程學(xué)生項(xiàng)目管理實(shí)訓(xùn)系統(tǒng)是一個(gè)將通信工程項(xiàng)目的實(shí)際流程情況按照模塊化的方式分解成幾個(gè)獨(dú)立的管理流程,根據(jù)通信工程中包含的招投標(biāo)實(shí)務(wù)以及工程監(jiān)理實(shí)務(wù)和項(xiàng)目管理等相關(guān)課程的基本要求來(lái)完成相應(yīng)的開(kāi)發(fā)和業(yè)務(wù)的配置。將前期的可行性研究、項(xiàng)目招投標(biāo)、項(xiàng)目設(shè)計(jì)、實(shí)施以及項(xiàng)目驗(yàn)收等工作流程轉(zhuǎn)化成系統(tǒng)實(shí)訓(xùn)子項(xiàng)目,形成一個(gè)整體流程,讓通信工程專(zhuān)業(yè)的學(xué)生可以通過(guò)平時(shí)在實(shí)驗(yàn)室的實(shí)際操作和項(xiàng)目跟蹤,更為清楚地掌握所學(xué)通信工程項(xiàng)目管理的實(shí)際工作流程,同時(shí)也能提高項(xiàng)目管理的相關(guān)業(yè)務(wù)能力。
1.2通信工程項(xiàng)目管理系統(tǒng)的功能概述
通信工程項(xiàng)目管理系統(tǒng)集合當(dāng)下常見(jiàn)的OA辦公、工作流、業(yè)務(wù)模型、過(guò)程管理、進(jìn)度管理、成本管理、PDA于一體,運(yùn)用C/S和B/S雙模式開(kāi)發(fā),輕松建立工程項(xiàng)目管理平臺(tái),系統(tǒng)支持局域網(wǎng)、本地網(wǎng)絡(luò)、廣域網(wǎng)以及互聯(lián)網(wǎng),管理者可以隨時(shí)隨地地對(duì)項(xiàng)目進(jìn)行跟蹤和管理。
1.3簡(jiǎn)單解析系統(tǒng)結(jié)構(gòu)
系統(tǒng)以項(xiàng)目的實(shí)際流程進(jìn)度為主體,以項(xiàng)目工程進(jìn)度、項(xiàng)目施工成本、業(yè)務(wù)合同管理為主要中心模塊,整合常規(guī)個(gè)人辦公、項(xiàng)目分包管理、業(yè)務(wù)材料管理、工程機(jī)械設(shè)備管理以及項(xiàng)目人員管理,相當(dāng)于整個(gè)系統(tǒng)都是按照項(xiàng)目對(duì)應(yīng)的流程和需求進(jìn)行開(kāi)發(fā)設(shè)計(jì),通過(guò)實(shí)際項(xiàng)目中各階層的權(quán)限、業(yè)務(wù)權(quán)限進(jìn)行分工協(xié)作,與此同時(shí),可以通過(guò)工作流程讓操作者對(duì)項(xiàng)目業(yè)務(wù)進(jìn)行工作審批。系統(tǒng)中包括了普通企業(yè)通用管理模塊,而對(duì)于項(xiàng)目業(yè)務(wù)進(jìn)度的跟蹤,本文采用最先進(jìn)的EXCEL工作流表單定制技術(shù),使用更方便,支持學(xué)生二次開(kāi)發(fā)。
1.4實(shí)際操作優(yōu)勢(shì)
第一,可以對(duì)分包商情況、每筆費(fèi)用使用情況、供應(yīng)商情況、員工情況進(jìn)行系統(tǒng)查詢。
第二,管理者可以通過(guò)這個(gè)系統(tǒng)的跟蹤和安排,實(shí)時(shí)了解各項(xiàng)目的動(dòng)態(tài)情況。
第三,員工可以通過(guò)系統(tǒng)功能模塊中的崗位設(shè)置,實(shí)現(xiàn)虛擬權(quán)限以及工作過(guò)程的信息化,不需要紙張辦公,大大地提高了工作效率,并且可以牢牢把控項(xiàng)目的進(jìn)度、發(fā)展?fàn)顩r和未來(lái)趨勢(shì)。
第四,本身具有很強(qiáng)的專(zhuān)業(yè)性和項(xiàng)目適應(yīng)性。
自定義的系統(tǒng)模塊設(shè)計(jì)添加,可以按項(xiàng)目需求進(jìn)行配置實(shí)施,快速幫助操作者進(jìn)入全新的網(wǎng)絡(luò)項(xiàng)目管理中。
2網(wǎng)絡(luò)數(shù)據(jù)傳輸與同步問(wèn)題
2.1網(wǎng)絡(luò)數(shù)據(jù)的運(yùn)用
基本數(shù)據(jù)在項(xiàng)目中的安全、快速、同步的問(wèn)題,將以項(xiàng)目的數(shù)據(jù)庫(kù)配置以及項(xiàng)目的運(yùn)行環(huán)境,同時(shí)基于局域網(wǎng)絡(luò)、互聯(lián)網(wǎng)絡(luò),以此實(shí)現(xiàn)項(xiàng)目數(shù)據(jù)的安全管理。
項(xiàng)目研發(fā)數(shù)據(jù)傳輸方式一:對(duì)于網(wǎng)速很慢、網(wǎng)絡(luò)不是很穩(wěn)定等情況,可以采用定期傳輸數(shù)據(jù)的方式,通過(guò)u盤(pán)或者數(shù)據(jù)線,定期生產(chǎn)離線包上傳到總部服務(wù)器數(shù)據(jù)庫(kù)進(jìn)行同步,同時(shí)子系統(tǒng)中實(shí)現(xiàn)數(shù)據(jù)的同步刷新。
項(xiàng)目研發(fā)數(shù)據(jù)傳輸方式二:使用互聯(lián)網(wǎng)進(jìn)行管理,遇到網(wǎng)絡(luò)不好的問(wèn)題,可以采用本地運(yùn)行模式。系統(tǒng)采用三層架構(gòu)的C/S模式開(kāi)發(fā),客戶端可以實(shí)現(xiàn)數(shù)據(jù)的緩存和業(yè)務(wù)邏輯,客戶端能夠安全、快速地訪問(wèn)系統(tǒng)數(shù)據(jù)。
項(xiàng)目研發(fā)數(shù)據(jù)傳輸方式三:對(duì)于網(wǎng)速好的,可以使用普通模式訪問(wèn)服務(wù)器端的數(shù)據(jù),隨時(shí)隨地同步跟蹤觀察即可。
項(xiàng)目研發(fā)數(shù)據(jù)傳輸方式四:參考華為大數(shù)據(jù)處理模式,采用分布式數(shù)據(jù)儲(chǔ)存進(jìn)行數(shù)據(jù)處理。
2.2基于工作過(guò)程通信工程項(xiàng)目管理實(shí)訓(xùn)系統(tǒng)集成
針對(duì)工程材料管理的特殊要求以及辦公資料的需要,系統(tǒng)可以與PDA掃描設(shè)備進(jìn)行數(shù)據(jù)連接,用戶只需手持PDA掃描設(shè)備就可以進(jìn)行材料的入庫(kù)、出庫(kù)及盤(pán)點(diǎn)。同時(shí)對(duì)項(xiàng)目資料的打印和下載起到快捷方便的作用。PDA掃描設(shè)備可以通過(guò)GPRS網(wǎng)絡(luò)以及數(shù)據(jù)線連接等方式,導(dǎo)入到數(shù)據(jù)系統(tǒng)中實(shí)現(xiàn)系統(tǒng)的智能化。
對(duì)于類(lèi)似于供應(yīng)商的管理,可以提供B/S架構(gòu)的訂單模式,供應(yīng)商直接在網(wǎng)上提交單據(jù)。用戶只需查詢審核并且導(dǎo)入到系統(tǒng)中就可以實(shí)現(xiàn)自動(dòng)存儲(chǔ)。數(shù)據(jù)接口,系統(tǒng)可以導(dǎo)入Excel數(shù)據(jù),直接生成表單,也可以直接導(dǎo)入Excel數(shù)據(jù)格式,方便在外地或者單機(jī)模式下也可以對(duì)項(xiàng)目進(jìn)行調(diào)度管理。
2.3系統(tǒng)特點(diǎn)
(1)C/S框架下采用windowsform設(shè)計(jì),數(shù)據(jù)庫(kù)支持sqlserver和oracle等大型數(shù)據(jù)庫(kù),系統(tǒng)簡(jiǎn)潔,操作簡(jiǎn)單,上手快,易用性強(qiáng),學(xué)習(xí)者不用專(zhuān)門(mén)學(xué)習(xí)也能了解和使用。
(2)采用Excel計(jì)算公式嵌入技術(shù),管理界面更美觀,業(yè)務(wù)功能更強(qiáng)大,使用更方便,一個(gè)流程或是數(shù)據(jù)的工作就是一個(gè)簡(jiǎn)單的表單,沒(méi)有復(fù)雜界面,實(shí)現(xiàn)異步數(shù)據(jù)開(kāi)發(fā),大大降低了業(yè)務(wù)之間的耦合。
(3)融OA辦公、工作流、業(yè)務(wù)模型、過(guò)程管理、進(jìn)度管理、PDA、成本管理于一體,管理員根本無(wú)需增加別的辦公軟件就可以實(shí)現(xiàn)項(xiàng)目的管理功能,真正的一鍵式操作管理。
(4)超強(qiáng)的兼容性,完全兼容Excel,可以導(dǎo)入及導(dǎo)出Excel,生成PDF文檔,同時(shí)對(duì)于電腦的兼容也極強(qiáng),能應(yīng)用于windowsXP,win7,windowsserver系列,同時(shí)支持Linux和MAC系統(tǒng)。
(5)工作流程不死板,可以自定義工作流程,實(shí)現(xiàn)了工作的無(wú)縫安排、自主跟蹤和驗(yàn)收,做到了真正的系統(tǒng)辦公,讓管理者管理時(shí)更輕松、有效。
(6)完美強(qiáng)大的報(bào)表功能,可以對(duì)表單進(jìn)行直接輸出、標(biāo)準(zhǔn)報(bào)表、三聯(lián)報(bào)表等,配合打印功能。
(7)高性能,基本采用富客戶端的理念進(jìn)行設(shè)計(jì),服務(wù)器端更多承受數(shù)據(jù)的壓力,保障了軟件的穩(wěn)定性。
2.4權(quán)限分工協(xié)議
(1)用戶操作權(quán)限:添加、修改、刪除、輸出權(quán)限,授權(quán)用戶擁有權(quán)限分組功能,同時(shí)任何操作記錄都會(huì)生成在管理日志(最高級(jí)可見(jiàn))。
(2)項(xiàng)目管理權(quán)限:授權(quán)用戶可以對(duì)應(yīng)訪問(wèn)的項(xiàng)目,每個(gè)角色都有對(duì)應(yīng)的授權(quán),采用用戶組權(quán)限旨理系統(tǒng)進(jìn)行權(quán)限限制。
(3)審批流程:對(duì)定義的不同的表單擁有相應(yīng)的審批流程,實(shí)現(xiàn)數(shù)據(jù)的工作流同步管理。
(4)系統(tǒng)模塊權(quán)限:授權(quán)用戶可以使用的對(duì)應(yīng)模塊,以組為單位建立模塊權(quán)限。
2.5主要模塊
2.5.1人員管理模塊
員工檔案:?jiǎn)T工信息、個(gè)人經(jīng)歷、證照列表、培訓(xùn)記錄、獎(jiǎng)勵(lì)記錄等員工基本信息。
用戶資料:用戶組權(quán)限系統(tǒng)分配定義、用戶的添加和刪除功能。
員工工資:項(xiàng)目中員工工資的計(jì)算、統(tǒng)計(jì)記錄以及發(fā)放情況的統(tǒng)計(jì)。
2.5.2個(gè)人辦公模塊
包括個(gè)人總結(jié)計(jì)劃、項(xiàng)目動(dòng)態(tài)、工作流程、文件通知、請(qǐng)假日志、工作任務(wù)分配。
2.5.3合同管理模塊
合同信息:各種項(xiàng)目設(shè)計(jì)到的合同電子檔和管理。
合同執(zhí)行:各種合同變更和合同記錄功能。
2.5.4材料管理模塊
庫(kù)存管理:對(duì)倉(cāng)庫(kù)進(jìn)行盤(pán)點(diǎn)、計(jì)算、庫(kù)存查詢。
材料計(jì)劃管理:材料預(yù)算計(jì)劃、采購(gòu)計(jì)劃、庫(kù)存預(yù)警等。
材料購(gòu)買(mǎi)合同:對(duì)材料合同進(jìn)行追蹤管理,材料入庫(kù)、出庫(kù)損耗管理、材料結(jié)算以及實(shí)時(shí)材料。
工具管理:工程使用工具的統(tǒng)計(jì)和租借管理。
2.5.5資料管理模塊
可以自動(dòng)生成合格的評(píng)定數(shù)據(jù)和不合格數(shù)據(jù),自動(dòng)匯總表格,自動(dòng)管理表格,自動(dòng)評(píng)定意見(jiàn),匯總分部及子分部,并且可以保證表格與統(tǒng)一用表書(shū)籍一致。
提供了表格填寫(xiě)范例、填表說(shuō)明、條目說(shuō)明等使用教程。
資料網(wǎng)絡(luò)同步化管理,可以多人聯(lián)網(wǎng)在線協(xié)同編制資料,同時(shí)項(xiàng)目經(jīng)理及監(jiān)理可以隨時(shí)進(jìn)入審批。
可以自己建立目錄,繪制任意表格,復(fù)制表格,添加表格,復(fù)制表格,外部導(dǎo)入Excel,導(dǎo)出Word,導(dǎo)出Excel\PDE編排表格順序等。
選擇相關(guān)單元格系統(tǒng)可以自動(dòng)按要求生成圖形。
內(nèi)含專(zhuān)業(yè)的技術(shù)及素材和施工組織設(shè)計(jì)方案作參考。
2.5.6項(xiàng)目財(cái)務(wù)管理模塊
通過(guò)付款單方式,對(duì)上述發(fā)生支出應(yīng)付款進(jìn)行支付。通過(guò)收款單方式,對(duì)工程上的收入項(xiàng)目進(jìn)行入賬。工程成本、人員成本、材料成本、機(jī)械成本、各種支出分析以及收入動(dòng)態(tài)生成分析。系統(tǒng)可以自動(dòng)生成相關(guān)應(yīng)付款日志、收款日志等財(cái)務(wù)交易信息。借款賬單、還款賬單、存款賬單對(duì)財(cái)務(wù)日常的資金進(jìn)行記錄。
2.5.7機(jī)械化設(shè)備管理模塊
設(shè)備信息、設(shè)備維修、設(shè)備的配件管理、設(shè)備借出借入、設(shè)備驗(yàn)收、設(shè)備折舊等管理。機(jī)械設(shè)備在工程中的使用情況,進(jìn)場(chǎng)、出場(chǎng)、租用情況的管理。
3結(jié)語(yǔ)